WO 17-07 Hilltop and Aronson Storm Drain Extension

The City of Billings will be extending the storm drain main in Hilltop Road from Shamrock Lane to Bazaar Exchange this summer.  Throughout this project specific zones of Hilltop Road will be closed to thru traffic with local access available.  This project is anticipated to last approximately two months during late summer.  Subsequent to this project, the storm drain main in Aronson Avenue from Nutter Boulevard to Dixon Street will also be extended.  This section of Aronson Avenue will be fully closed to thru traffic with local access available during the entire duration of construction.  It is anticipated that construction on this section of Aronson will last approximately one month.

  1. Tyler Westrope

    Staff Engineer II
    Phone: (406) 247-8656

  2. Public Works Engineering Division

    Physical Address
    2224 Montana Ave
    Billings, MT 59101

    Phone: (406) 657-8231
    Fax: (406) 237-6291